Installation and replacement process of basin support

Source:Jiangsu Wanbao      Release date: 2021-05-21
Whether it is an urban bridge or a highway bridge, continuous box girder is a commonly used structural form. In order to solve the vertical bearing capacity, horizontal displacement and rotation, the continuous box girder is currently commonly used basin-type rubber bearings. The installation and replacement of basin rubber bearings is an important part of bridge construction and maintenance, whic
Whether it is an urban bridge or a highway bridge, continuous box girder is a commonly used structural form. In order to solve the vertical bearing capacity, horizontal displacement and rotation, the continuous box girder is currently commonly used basin-type rubber bearings. The installation and replacement of basin rubber bearings is an important part of bridge construction and maintenance, which has attracted wide attention from the industry.
1. Determine the principled jacking plan based on the actual situation, that is, partial jacking or overall jacking. The advantage of local jacking is that it is easy to control the jacking and reduce equipment investment; the disadvantage is that jacking can easily lead to large deformation of the beam and a long construction period. The advantage of overall jacking is that it is easy to control the stress in the beam and the construction period is shorter, but more jacking equipment and personnel are required, and it is difficult to coordinate and control the deformation of various parts during the jacking process. If the design permits, try to give priority to partial jacking.
2. Calculate the theoretical jacking reaction force value of each part according to the beam structure form and design parameters, and determine the appropriate number and model of jacks according to the reaction force. The basic principles of "large size, moderate quantity, and controllable grading" should be followed when selecting models.
Large: It means to choose a jack model with a larger safety reserve factor as much as possible. For example, when choosing a jack, ensure that the actual jacking force is less than 75% of the theoretical jacking force.
Moderate quantity: It means that it is not advisable to use more jacks to achieve the requirement of total jacking force, and at the same time, it should not be too few, that is, there should be at least one jack on both sides of each support. More jacks will make it difficult to work together, and too few jacks will cause difficulty in starting or once an individual jack fails, it will affect the entire jacking process.
Hierarchical controllable: The jacking equipment with synchronous jacking information control system or the jack equipment with throttle control should be preferred to realize jacking synchronization or difference limit control.
3. It is necessary to choose the setting position of the jacking point reasonably to avoid local damage of the concrete. According to the design drawings, the top surface of the jack should be arranged within the beam, or the lifting surface should be adjusted to within the beam by means of beams or longitudinal beams. If conditions permit, the jack should be arranged near the support position on the cover beam. The force-bearing surface should adopt wedge iron, with a large force-bearing area, adjust the vertical and horizontal slope of the bottom of the box girder to ensure that the jack can apply force vertically.
4. When the space between the cover beam and the bottom of the beam cannot meet the jack layout requirements, a bearing column should be used as the back of the jack. When the pier column is not high, the bearing column should be placed on the cap, otherwise the foundation should be handled well to ensure that the strength and deformation of the foundation meet the lifting requirements. When the pier column is too high or the water pier should adopt the hoop method, the bearing column should be placed on the hoop corbel. The design of the bearing column should ensure sufficient strength and rigidity. The load-bearing column should preferentially adopt the steel pipe form.
5. In the jacking plan, the command and dispatch, information transmission, and feedback mechanism in the jacking process should be formulated in detail to ensure that the entire process is strictly controlled. Priority should be given to the use of walkie-talkies for synchronous information transmission, and the responsibilities and division of labor of management and operators at all levels should be clearly defined.
6. The jacking plan should clarify the emergency control measures for various risks, formulate several sets of emergency adjustment plans, implement them according to the favorable plan, and prepare according to the unfavorable plan to prevent serious quality accidents or safety accidents.
7. The lifting plan should clarify the control methods and measures for the synchronous displacement or the difference limit during the lifting process, and supplement it with real-time monitoring and measurement of displacement, stress, strain, etc. when necessary to ensure the safety of the existing beam.

8. The method of removing the old support and installing the new support shall be described in detail in the jacking plan. In particular, the installation process methods of the new bearing installation and the bridge construction are very different due to the constraints of different conditions in different periods. There may be local adjustments of the bearing installation method, which should be clarified in the plan.

Basin support

主站蜘蛛池模板: 国产精品免费看久久久| 无码人妻av一二区二区三区 | www.欧美色| 日本19禁综艺直接啪啪| 亚洲av永久无码精品古装片| 欧美肥妇毛多水多bbxx水蜜桃 | 国产综合色在线视频区| аⅴ中文在线天堂| 收集最新中文国产中文字幕| 久久精品国产亚洲av电影网 | 国产三级在线播放| 黑人大长吊大战中国人妻| 国产精品久久久久影院嫩草| 91精品免费看| 天天干天天操天天操| 一级毛片a免费播放王色| 把胡萝卜立着自己坐上去| 久久国产精品免费一区二区三区 | 亚洲欧美一区二区三区在线| 琪琪see色原网一区二区| 加勒比综合在线| 老子的大ji巴cao死你| 国产亚洲精品无码专区| 黄色网址在线免费| 国产欧美日韩另类精彩视频| 18禁美女黄网站色大片免费观看| 国自产拍91大神精品| a国产乱理伦片在线观看夜| 好色先生tv网站| 一本久久a久久精品亚洲| 成人在线免费网站| 中文字幕影片免费在线观看| 无码人妻丰满熟妇区毛片| 久久亚洲欧美日本精品| 日韩人妻无码中文字幕视频| 乱人伦xxxx国语对白| 欧美aaaaaa级午夜福利视频| 亚洲伊人久久大香线蕉结合| 欧美黑人xxxx| 亚洲综合校园春色| 狠狠综合亚洲综合亚洲色|